CONSTRUCTION

POLE CONSTRUCTION W/STEEL ROOF

* 6 x 6 Treated Timbers 8' o.c. (or less), 2 x 6 T&G Treated Double Skirt Boards (Bottom Grade).
* 2 x 6 Wall Girts 2' o.c., 2 x 4 Roof Purlins 2' o.c., Double 2 x 12 Yellow Pine Headers (Bolted On) On Bearing Walls To Carry Roof Trusses 4' o.c., Standard 4/12 Roof Pitch, 1' Overhangs On All Walls.
* 2 x 6 Gutter Board, Full Profile Ridge Vent, Typar Vapor Barrier Under Steel Roofing, L.V.L. Microlam Header Systems On Spans 14' Or Wider.
* All Roofing & Siding Panels Screwed on With Silver Sentry Woodgrip Newoprine Screws.  No Direct Contact Of Metal To ACQ Lumber.

 

POLE CONSTRUCTION W/SHINGLED ROOF

* 6 x 6 Treated TImbers 8' o.c. (or less), 2 x 6 T&G Treated Double Skirt Boards (Bottom Grade)
* 2 x 4 Wall Girts 2' o.c. (19 1/2" On Walls Over 14' Tall), Double 2 x 12 Yellow Pine Headers Bolted Onto Poles Of Load Bearing (truss) Walls With 2 - 1/2" x 10" Carriage Bolts.
* Trusses 2' o.c. With 1/2" OSB Decking, Clips Used Between Trusses, 15# Felt, 25 Year 3-Tab Or 30 Year Oakridge Shingles, Sloped Roof Vents.

 

FRAME CONSTRUCTION BUILDING

* 2 x 4 Studs 16" o.c., 1/2" OSB Sheeting.
* Trusses 2' o.c.,  1/2" OSB Sheeting, 15# Felt , 25 Year Shingles.
* Built On Monolithic Concrete Floor/Foundations.  1/2" Anchor Bolts 6' o.c., Sill Sealer Under Bottom Treated Wall Plate, Floor Has Raised Curb.

 

MORE IMPORTANT INFORMATION

All Building Have Treated Uplift Blocks Put On Buttoms of Timbers. Trusses Anchored To Walls W/2 x 6 Blocks & Metal Tie-Down Straps. 

 

WHAT TO EXPECT DURING CONSTRUCTION

The Customer Does Not Pay Anything Until The First Day Of Construction.  That Is When The First Draw Is Needed, Which Is The Largest Draw That Covers All Materials.  Barncraft Buildings Has A Reputation Of Over 20 Years Of Excellent Business Practices.

If The Ground Is Wet Near The Construction, Expect The Ground To Be Torn-up 20 Feet Around The Building Area.  If You Are Having Us Bring Material Trucks Over Blacktop Of Concrete Driveways, You Are Risking Damage That We Are NOT Responsible For. (Especially Blacktop In Hot Weather)

We Ask That You Mark Or Point Out Any Septic Tank Lines.  If the Ground Is Wet, Large Trucks Could Cause Damage To Them.  If You Do Not Want Trucks On Your Driveways Or In Your Yard, Please Let Us Know.  For This There Will Be An Added Charge Into The Labor Price.

If You Add Options To Your Building After The Construction Has Started, Such As A Window For Example, It Will Be A Extra And Charged At The Last Draw.

During Construction We Keep The Job Site As Clean As We Can.  We Pick Up Trash Daily To Help Prevent It From Going Everywhere.  The Last Day Of Construction, The Area Will Be Cleaned Well.  Trash Will Be Hauled Off The Job Site. 
 


 